Quantcast
Channel: Bilik Sewa | Bilik Untuk Disewa | Sewa Bilik | Kuala Lumpur - Shah Alam | Malaysia Room Rental Advertisement - All Forums
Viewing all articles
Browse latest Browse all 1466

Composite wood flooring Questions (1)

$
0
0
1, the purchase of wood flooring, you should understand the main technical indicators: 1, wear indicators; 2, impact resistance; 3, stain resistance, stain; 4, anti-smoke burning; 5, the wear of the contact surface ; 6, chair casters scratch; 7, after absorbing water volume expansion; 8, formaldehyde emission.
2, how to understand the formaldehyde emission?
Formaldehyde is a chemical gas content in the air up to a certain concentration, it will cause harm to humans. It is mainly used in the manufacturing process of the composite material, from the adhesion. Such formaldehyde contained in the floor will not evaporate immediately, but slowly evaporate because of different temperature and humidity conditions, volatile time more than a decade. Permanent residence in the environment of excessive formaldehyde concentration of formaldehyde will be human eyes, nose, respiratory system or cause significant harm to people suffering from skin diseases. Animal experiments also showed that excessive formaldehyde emission also cause nasal and respiratory cancer.
Therefore, countries regarding formaldehyde emission plywood products have developed strict standards, such as Japan, the EU Community countries have regulations for every 100 grams of plywood formaldehyde emission must be less than or equal to 10 mg, otherwise not allowed to sale; about our plywood products formaldehyde emission standard (GB / T 18102-2000) regulations: a class (superior products) - per 100 grams of plywood formaldehyde emission must be less than or equal to 9 mg; class B (qualified) - per 100 grams of formaldehyde plywood release in more than 9 mg, less than 40 mg.
What do I need to install the floor?
3, the installation should pay attention to what?
A: 1, can not be installed on uneven or wet ground, such as kitchen and bathroom. 2, can not be installed in newly laid concrete floor. 3, the concrete floor to dry at least 80 days. 4, at least 2mm thick polyethylene mats. 5, can be laid on the ground plumbing, but you can not lay on the floor electric heating.
4. Why must strictly regulate the installation conditions?
A: If you do not meet the specifications of the installation on the ground floor, will result in the following consequences: the floor from the dark, warped, uneven floor.
5, why should advance to the construction site survey?
A: professional and technical personnel in accordance with standards of investigation, is to ensure that the ground conditions are met before flooring installation specifications, to ensure the best installation results.
6, Q: why do we need at least 24 hour delivery system?
A: Yes, in order to allow users to adapt to the temperature room floor indoor and outdoor humidity differences after installation to ensure that the floor will not be deformed, guarantee quality of the installation.
all link:
cheap durable composite fences india
shower wall cladding composite decorative
Outdoor Deck Plastic Stair Treads

Viewing all articles
Browse latest Browse all 1466