Ground handling before installation to detail: the ground within a two meter radius of the range must be level, height difference should not exceed 3mm. Ground to be completely dry before installing the using composite decking for chair floor, it must test of geothermal heating, water temperature of at least 50 ��, to ensure that the heating system is operating properly. And incubated to 24 hours or more, so that the ground is dry, the moisture content to ensure compliance with standards.
The most important details of the installation process, pay attention to the order of: the best use of floating installation, the floor close to the ground through the cushion material, there are no gaps between the floor and the ground, and to shrink the gap between the made fence to cover concrete steps floor reserved for more. Since water heating heat radiation release a large amount of moisture, so the moisture to work on. It must first clean up the ground pavement, pay attention to clean up the corner straight to ensure that leave enough expansion joints. The second step on the ground spread a layer of plastic sheeting to keep out moisture, to make plastic sheeting were up at four corner ground 10cm. The third step is the laying of mats. Note joints to set aside, at least at the interface overlap 5cm, and must be sealed with tape. To use thicker than the ordinary floor skirting board number, and require an independent construction. After installing the 8 inch composite decking floor after 24 hours before heating. In order to facilitate thermal conductivity, bedding material should not be too thick.
To use special paper mats: ground square pvc fence price in Zambia floor and floor mats can not be used between ordinary foam mats, be sure to use geothermal special paper mats, floor mats because such heat quickly, without distortion. Regular foam mats thermal slow, long-term in high temperature conditions, easy to produce harmful gas, endangering the health.
The most important details of the installation process, pay attention to the order of: the best use of floating installation, the floor close to the ground through the cushion material, there are no gaps between the floor and the ground, and to shrink the gap between the made fence to cover concrete steps floor reserved for more. Since water heating heat radiation release a large amount of moisture, so the moisture to work on. It must first clean up the ground pavement, pay attention to clean up the corner straight to ensure that leave enough expansion joints. The second step on the ground spread a layer of plastic sheeting to keep out moisture, to make plastic sheeting were up at four corner ground 10cm. The third step is the laying of mats. Note joints to set aside, at least at the interface overlap 5cm, and must be sealed with tape. To use thicker than the ordinary floor skirting board number, and require an independent construction. After installing the 8 inch composite decking floor after 24 hours before heating. In order to facilitate thermal conductivity, bedding material should not be too thick.
To use special paper mats: ground square pvc fence price in Zambia floor and floor mats can not be used between ordinary foam mats, be sure to use geothermal special paper mats, floor mats because such heat quickly, without distortion. Regular foam mats thermal slow, long-term in high temperature conditions, easy to produce harmful gas, endangering the health.